Woodlands First & Middle School

Woodlands First & Middle School

Product: Coniston (on Rear Posts)

The Design Manager from Keepmoat submitted a tender to us as they were working on a number of school projects which included Woodlands First & Middle School in Edgeware, Essex. The school was undergoing a range of building works and part of their revamp included a canopy to match their existing canopy as best as possible.

As they can they required was wall mounted, it was clear that the Coniston Wall Mounted Canopy would be perfect. Their existing canopy had a galvanised steel finish so we coloured the Coniston in Silver Grey (RAL 7001) with a matt finish as the Coniston is constructed from Aluminium not steel. This ensures the canopy has a much longer life span and higher strength.

Installation Details: 

Size: 15.7m x 1.77m

Canopy Colour: Silver Grey RAL 7001

Contracting Company: Keepmoat
Architect: EllisWilliams Architects

Installed at:
Woodlands First & Middle School
Bransgrave Road
Edgeware
Middlesex
HA8 6JP

Installation Date: December 2015

Click to view other installations in Middlesex

For more Information or to find out if you qualify for a Free Site Survey