Heathfield Primary School
- Product:
- Cycle Shelters
Heathfield Primary School, Scotland
Product: 8 Bespoke Cycle Shelters
Size: 2.1m x 2.7m each
Additional Options: 26 Sheffield Cycle Racks
Estimated Value: £31,000
Heathfield Primary School required a secure cycle parking area within their school grounds in Ayr, Scotland. This job was contracted by Mansell Construction who is a UK wide contractor with an office local to Heathfield Primary School. The staff at Mansell Construction sent their tender opportunity to Able Canopies and contacted Able Canopies via the telephone to discuss the tender and the options required.
After discussions regarding the project, Able Canopies felt it would be most ideal to design a bespoke cycle shelter in order to fit in with the design requirements that the school & contractor had in mind.
A quotation was sent to the contractors and they were happy with the price and the quality of the product on offer. The quotation was for x8 bespoke cycle shelters which were each 2.1m long x 2.7m wide; 26 Sheffield Cycle Racks were also included in this quote as requested for additional cycle storage.
The contractor placed the order and the shelters and cycle racks were installed with no problems along the way.
The Project Manager stated that the installation and product received from Able Canopies was “excellent” and they would recommend us.
“Works were executed in a safe and well executed manor.” – Project Manger.
If you have any questions, or to find out if you qualify for a Free Site Survey contact us and we will be happy to help.