Moorside Primary School – Wall Mounted Canopy
Product: Coniston (on Rear Posts)
Moorside Primary School in Newcastle, Tyne & Wear were looking for us to replace an existing timber canopy with one of our canopies with the same specification as the previous Coniston we installed at the school in September 2020.
To meet the requirements, we installed a 10.75m x 2.6m hip into 18.2m x 2.6m Coniston Wall Mounted Canopy on Rear Steel Goal Posts. This created a large covered outdoor area to a row of classrooms allowing children to take part in outdoor learning and play activities. The canopy also creates a covered walkway protecting staff and students from the rain when walking from one area of the school to another.
Installation Details:
Size: 10.75m x 2.6m hip into 18.2m x 2.6m
Canopy Colour: White
Contracting Company: RHD Construction & Environmental Contractors
Installed at:
Moorside Primary School
Beaconsfield Street
Newcastle upon Tyne
NE4 5AW
Installation Date: February 2021
Click to view other installations in Tyne & Wear
For more Information or to find out if you qualify for a Free Site Survey