Hillside Primary School – Third Install

Hillside Primary School – Third Install

We previously installed an Entrance Canopy and a Wall Mounted Canopy at Hillside Primary School. They got back into contact with us wanting us to install a cycle shelter so the staff and pupils can securely park their bikes.

To meet the schools requirements we supplied and installed a 4.1m x 1.7m Easydale Cycle Shelter which includes 5 cycle hoops. The school chose the frame of the shelter to be coloured in Gentian Blue.

Installation Details: 

Size: 4.1m x 1.7m

Frame Colour: Gentian Blue RAL 5010

Installed at:
Hillside Primary School
Rushey Way
Lower Earley
Reading
Berkshire
RG6 4HQ

Installation Date: April 2016

Click to view other installations in Berkshire

For more Information or to find out if you qualify for a Free Site Survey







    Related Installations